Jump to content
Sign in to follow this  
QuicksilverBMX

ET Kuwahara build, yes its finished

Recommended Posts

Finally Finished, only took 4 years!! Thanks to Roberto for the Awesome powder job! Most parts are NOS or nice used bits. I wont bore you with the crappy details of some of this build :D

 

Kuwahara ET frame/forks

Nitto Bars

Sugino stem

OGK grips

Dia compe brakes/lever

Sugino cranks/spider/chainwheel

KKT AMX pedals

Suntour high flange hubs

Ukai speedline wheels

IRC Z-III tyres

ET Elina seat

Fluted seat pole

Suntour seatclamp

P1000014.jpg

P1000013.jpg

P1000011.jpg

P1000012.jpg

P1000015.jpg

P1000016.jpg

P1000017.jpg

Share this post


Link to post
Share on other sites

WOW... THat is perfect. Right out of the ads in the magazine.

 

I'm building one of my own. What was the hardest part for you to locate?

 

I've been dying to get that Sugino stem for a long time.

Share this post


Link to post
Share on other sites

Believe it or not the only part holding me up was the smoke anno front Suntour high flange hub, took me the best part of 4 years to collect the rest, the front hub was the last thing I needed.

 

The tires are not correct but at leats they are IRC's just a later model. By far this is the most difficult build I have undertaken

Share this post


Link to post
Share on other sites

Wow, what a great bike! I can only imagine the time and dedication set aside for this project.

 

Dopeness!

Share this post


Link to post
Share on other sites

really nice

Share this post


Link to post
Share on other sites

Awesome ET Reece! Looks dialed in down to the pedals!

 

Saweet!

 

21

Share this post


Link to post
Share on other sites

kick ass bro very nice job :15:

Share this post


Link to post
Share on other sites

Awesome -- I can tell you put a lot of time and effort into that. Came out great!

Share this post


Link to post
Share on other sites

Hey Reece that kicks ass!

 

I'm wrapped you didn't take your bat and ball and go home when it stared going sour. Good on ya mate!!! two thumbs up.

 

Roberto did a great job with the powder and the rest is perfect. once again well done, love it!

 

:naughty:

Share this post


Link to post
Share on other sites

Well done Reece, that bicycle is a credit to you. I really like the attention to detail!

Share this post


Link to post
Share on other sites

Nice looking bike. Very clean. Congrats on a super-fine build.

Share this post


Link to post
Share on other sites

Looks terrific ! Way to go all out with the attention to detail

 

Great build all around

Share this post


Link to post
Share on other sites
Finally Finished, only took 4 years!!

 

 

kudos man you deserve it :ThumbsUp:

 

 

as said the detail is outstanding... the powder is in freakin credible!

 

 

excellent job!

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×